caption

Streets

Mission:  To maintain City streets in a clean and safe condition for pedestrian and motorized traffic

Street Department Performs:  

  • Street sweeping on each City street, once a month (depending on weather conditions)
  • Minor asphalt repairs on utility cuts
  • Minor asphalt overlay on streets not requiring utility upgrades
  • Fills potholes
  • Erects or replaces street signs
  • Barricades streets during inclement weather or at low water crossings
  • Barricades streets for downtown City events
  • To see a map of Street Maintenance performed or upcoming (2004 to 2017) click here 
A permit to work on City Street is required when:

  • Installing curb
  • Installing a sidewalk
  • Installing a driveway to the end of the street
  • A street or existing curb cut is requested
  • To access the Application to Work on City Street click here
  • See Design Standards for required drawing details for your specific project
Questions:
(830) 401-2416

Get Notifications